IFS helps SDIC Qinzhou Power cut operational costs by 20% on average

The Chinese power industry has undergone market reform, with increased pressures to improve operational performance and output, and digital disruption is re-imagining business. By running IFS Applications, Qinzhou Electric Power is addressing these challenges. The results are improved productivity and quality, reduced operational costs, greater process automation and better decision-making—and enhanced competiveness. Other benefits include:

  • Reduced maintenance and repair costs by 15%
  • Reduced management cost by 10%
  • Enhanced inventory turnover rate by 30%
  • Reduced inventory cost by 33%
  • Reduced  unscheduled asset downtime with predictive maintenance 

Download the customer story to learn more.

File Information: Case Study, pdf 0.2 MB

Share via E-mail Share to Twitter Share to LinkedIn Share to Facebook Share to Google+

DOWNLOAD Case Study

Download